Supply, installation and integration of security and control systems for the new airport facilities.
Jorge Chávez de Lima Airport
Service
Goal
The provision of security systems for the major expansion project of this airport that will double the capacity of the current infrastructure: new runway, new control tower, new facilities and buildings and new passenger terminal to be started in 2022.
Result
Completed in 2023, the CCTV, CCAA, FIDS and BMS systems were deployed as part of the NewLim project work package 2.3 (WP2.3) for some new buildings adjacent to the passenger terminal.
A new modern PIDS (Perimeter Intrusion Detection System) has also been deployed to optimize and automate the airport’s perimeter control work.
Location
Peru
Client
LAP